UNIT 1- Conventional Software Management
Q.1 Explain Important trends in improving Software economics. What is process automation structure ? How does process automation work ? (RGPV MAY 2024)
Q.2 Explain the evolution of software economics. (RGPV MAY 2023)
Q.3 How to improve software economic? Elaborate. (RGPV MAY 2023)
Q.4 Write the principles of modern software management. (RGPV MAY 2023)
Q.5 What is the importance of Software Project Planning? (RGPV MAY 2022)
UNIT 2- Software Management Process
Q.1 Explain different phases of the life cycle process. (RGPV MAY 2024)
Q.2 Explain model based software architecture in detail. (RGPV MAY 2024)
Q.3 What is an artifact in software development? Explain in detail. (RGPV MAY 2024)
Q.4 Explain the goal of Inception phase, Elaborate phase, Construction phase and Transition phase (RGPV MAY 2024)
Q.5 Explain model based software architecture in detail. (RGPV MAY 2024)
Q.6 Describe the concept of work flows of the process in software management. (RGPV MAY 2024)
Q.7 Explain life cycle phases with examples. (RGPV MAY 2023)
Q.8 Explain the concept of management artifacts and engineering artifacts. (RGPV MAY 2023)
Q.9 Determine the model based software architecture. (RGPV MAY 2023)
Q.10 Explain the following process in detail: (RGPV MAY 2023)
a) Workflow of the process
b) Checkpoints of the process
UNIT 3- Software Management Disciplines
Q.1 Discuss the role of multidisciplinary team in planning project activities. (RGPV MAY 2024)
Q.2 Differentiate between conventional and modern software project management (RGPV MAY 2024)
Q.3 Illustrate the term cost estimating and improvement in project budgeting. (RGPV MAY 2024)
Q.4 What are the four stages of process automation? Why do we need process automation? (RGPV MAY 2024)
Q.5 What is project control and process instrumentation? Explain the four steps in project control process. (RGPV MAY 2024)
Q.6 What are the various success factors in project control system? List a few problems that could arise in project control. (RGPV MAY 2024)
Q.7 What do you mean by lifecycle expectations? (RGPV MAY 2024)
Q.8 Explain the Iterative Process planning with suitable example. (RGPV MAY 2024)
Q.9 Illustrate iterative process planning in detail. (RGPV MAY 2023)
Q.10 Elucidate project organization and responsibilities. (RGPV MAY 2023)
Q.11 Explain the following term in detail: (RGPV MAY 2023)
(a) Process automation
(b) Software management team
Q.12 Briefly explain life cycle expectations. (RGPV MAY 2023)
Q.13 Explain the concept and importance of software economic in project management. (RGPV MAY 2023)
Q.14 Explain the following: (RGPV MAY 2023)
a) Project environment
b) Pragmatics artifacts
c) Process discriminants
d) Management indicators
Q.15 Explain life cycle phases with examples. (RGPV MAY 2022)
Q.16 Explain why a software system that is used in real world environment must change or become progressively less useful. (RGPV MAY 2022)
Q.17 Explain the following terms with example: (RGPV MAY 2022)
i) Workflows of the process
ii) Checkpoints of the process
iii) Process automation
iv) Process discriminants
EXTRA QUESTIONS
Q.1 What are the main activities carried out during requirements analysis and specification? Discuss the characteristics of a good software requirements specification document. (RGPV MAY 2022)
Q.2 What is a task set? Write the various steps in selecting appropriate task set for a project. (RGPV MAY 2022)
Q.3 What is risk identification? How risks are monitored and managed by project managers? (RGPV MAY 2022)
Q.4 How various stakeholders are organized to perform effective software engineering? Explain. (RGPV MAY 2022)
Q.5 Compare top-down and bottom-up design strategies.
Q.6 What is the significance of adopting programming practices and coding standards? (RGPV MAY 2022)
Q.7 What is the need of a modular system? Describe the effects of cohesion and coupling in modular design. (RGPV MAY 2022)
Q.8 An air traffic control project of size 500 KLOC is to be developed. Software project team has very little experience on similar projects and the project schedule is also tight. Calculate the effort, development time, average staff size and productivity of the project. (RGPV MAY 2022)
Q.9 What is software maintenance? Explain various categories of software maintenance. (RGPV MAY 2022)
Q.10 Describe software configuration management process. (RGPV MAY 2022)
Q.11 What are the signs that a software project is in jeopardy? What are the steps to be taken by a project manager to tackle this situation? (RGPV MAY 2022)
— Best of Luck for Exam —